Fleet Care Program at Klagenfurt (LOWK)
Twelve-month appearance plans for based fleets: scheduled turns, priority access, one invoice.
The Fleet Care Program at Klagenfurt covers based aircraft through a twelve-month calendar of scheduled quick turns, monthly cabin detailing, seasonal exterior polish and brightwork restoration. Designed for charter operators, corporate flight departments and FBOs running fleets from LOWK, the programme locks in a fixed monthly budget per tail number, assigns a dedicated crew familiar with your aircraft, and guarantees priority allocation for AOG requests. Every service is documented with photos and logged into a shared history, with quarterly reviews to adjust the calendar around your operational tempo.
10L/28R · 2720 m, 10R/28L (grass) · 710 m
AIP and airport data1472 ft
Airport (AD administration, customs/immigration, fuelling): Mon-Fri 05:45-23:30, Sat 05:45-22:00, Sun 07:00-23:30 local (AIP Austria: MON-FRI 0445-2230 UTC winter / 0345-2130 UTC summer, SAT 0445-2100 / 0345-2000, SUN 0600-2230 / 0500-2130)
Closed outside the operating window; Schedule Coordination Austria: night curfews apply outside these hours, only ICAO Annex 16 Chapter 3 aircraft accepted2.8 km
Klagenfurt city centre (1.5 NM north-north-east)1 on the airport
independent, no affiliationGAC (General Aviation Center) with dedicated GAC apron (bitumen, PCN 22/F/B/W/T); security control for apron access at Tor 1 daily within airport operating hours
What changes at Klagenfurt?
Klagenfurt sits at 1472 feet elevation, 2.8 kilometres north-north-east of the city centre, with a 2720-metre main runway (10L/28R) and a 710-metre grass strip (10R/28L). The airport closes every night—23:30 local Monday to Friday and Sunday, 22:00 Saturday—and customs, immigration and fuelling run only inside those windows. The GAC (General Aviation Center) operates a dedicated bitumen apron (PCN 22/F/B/W/T) with airside access through security control at Tor 1; handling is provided by the airport-operated GAC desk ([email protected]), which also manages PPR and fire-category upgrades to CAT 8 with 24 hours' notice.
For fleet programmes, the night closure means scheduled detailing must fit inside the operating window or be arranged with the airport in advance. We build the service calendar around your block times and the GAC's apron availability, slotting quick turns during crew-rest periods and scheduling heavier work—monthly interiors, seasonal polish—on layover days when the aircraft is cold-soaked and the cabin has had time to off-gas. The alpine climate accelerates oxidation on leading edges and nacelles, and winter deicing fluid leaves residue in gear bays and on belly panels; the programme includes seasonal decon washes and brightwork touch-ups timed to the first snowfall and the spring thaw.
How is a twelve-month programme structured?
We map the calendar to your flight schedule: quick turns (dry wash, cabin tidy, galley restock) after every second or third rotation, monthly deep interiors when the aircraft overnights, and quarterly exteriors with single-stage polish and brightwork restoration. Each tail number receives a fixed monthly budget covering labour, consumables and ramp access; additional work—decon washes after a dust storm, leading-edge touch-up after a bird strike—is quoted separately but prioritised ahead of ad-hoc requests from transient operators.
The service history lives in a shared folder: photos of the exterior under natural light, notes on any new scratches or corrosion, records of which OEM cabin materials were treated and which panels were pulled for deep cleaning. Every quarter, we sit down with your operations team to review the calendar, adjust frequencies if utilisation has changed, and plan seasonal work—anti-static treatment before winter, hydrophobic refresh before the wet months. The programme renews automatically unless you cancel with thirty days' notice, and the monthly rate stays flat for the twelve-month term.
What does the handler expect from a third-party detailing crew?
The GAC requires all third-party contractors to hold a valid airside pass or be escorted by handling-agent personnel; we carry our own passes for Austrian airports and coordinate escort logistics when passes expire or when new crew rotate in. The handler expects advance notice—usually 24 hours—of any work that will keep the aircraft on the stand beyond the scheduled turnaround, and they want confirmation that GPU, air-start and potable water have been requested through the handling order, not assumed.
On the apron, the handler watches for three things: that we chock and cone the aircraft before opening any panels, that we never touch pitot tubes or static ports without the tech log open beside us, and that all waste water and polish residue go into our own recovery tanks, not onto the bitumen. For fleet programmes, we file a blanket notification with the GAC at the start of the contract listing every tail number, the expected service frequency, and the names of our crew leads; the handler then waves us through Tor 1 with a glance at the daily handling sheet, and we text the apron supervisor when we arrive and again when we vacate the stand.
How does documentation work across a twelve-month programme?
Every visit generates a digital report: time-stamped photos of the exterior from eight angles (nose, tail, both sides, both winglets, belly, cheat line), a checklist of tasks completed (cabin vacuum, galley wipe-down, lavatory service, exterior dry wash, brightwork polish), and notes on any defects observed—paint chips, corrosion bloom, cracked window seals, hydraulic weeps. The report goes to your operations team within two hours of the aircraft leaving the stand, and a copy sits in the shared service-history folder alongside every previous report for that tail number.
The photo archive becomes a timeline of the aircraft's appearance: you can scroll back six months and see exactly when that leading-edge chip first appeared, or compare this winter's belly staining to last winter's to decide whether the decon frequency needs to increase. For charter operators, the archive is useful when a client questions an invoice or when you need to prove to an underwriter that the aircraft has been maintained to a consistent standard. For corporate flight departments, it simplifies handover when a new chief pilot or flight-department manager takes over and wants to understand what's been done and what's due.
What does the alpine climate do to paint and cabin materials?
Klagenfurt's elevation and proximity to the Alps mean rapid temperature swings—aircraft parked overnight in winter can drop below freezing, then warm to fifteen degrees by mid-morning as the sun hits the apron. That cycling cracks sealant around windows and access panels, and it pulls moisture into the cabin through any gap in the pressure vessel. Inside, the moisture condenses on cold-soaked sidewalls and settles into carpet and seat fabric, breeding mildew if the aircraft sits for more than a few days without a cabin air exchange.
Outside, winter deicing fluid (Type I and Type IV) leaves a glycol film on belly panels, gear doors and the underside of the horizontal stabiliser; if it's not rinsed off within a week, it attracts dust and exhaust soot, baking into a brown crust that needs a decon wash and a clay-bar pass to remove. Spring pollen from the surrounding forests coats the fuselage and wings in a yellow film that etches into single-stage paint if left under the sun for more than a fortnight. The fleet programme schedules decon washes at the end of deicing season and again in late spring, with a hydrophobic top-coat applied after each wash to make the next cleaning easier and to extend the holdover time for any rain or dust between services.
How do you handle AOG requests inside a fleet programme?
Every fleet-programme client receives a dedicated mobile number that rings through to the crew lead assigned to their aircraft; if you call at three in the morning because a charter client has just complained about a stained carpet or a smeared windscreen, the crew lead either dispatches a technician from home or meets the aircraft personally if it's within driving range of Klagenfurt. Priority access means we pause work on transient aircraft and move your tail to the front of the queue, even if it means rescheduling another operator's pre-booked slot.
AOG cover includes the cost of one emergency callout per tail per quarter; additional callouts are billed at an hourly rate, but the rate is lower than our standard AOG fee because the crew already knows the aircraft and doesn't need a pre-service briefing. If the request comes in while the aircraft is airborne—say, a passenger has spilled red wine and you want it treated before it sets—we coordinate with the GAC to have a technician waiting on the apron with a UV lamp and enzyme cleaner the moment the door opens, so the stain is blotted and neutralised before the crew has finished the shutdown checklist.
Questions operators ask about Fleet Care Program at Klagenfurt
Can the programme cover multiple tail numbers at different utilisation rates?
Yes, each tail receives its own service calendar and monthly budget scaled to its flight hours. We build a separate calendar for each tail number, adjusting the frequency of quick turns, monthly interiors and seasonal exteriors to match how often the aircraft flies. A high-utilisation charter jet might need a quick turn every week and a deep interior every month, while a lightly used corporate transport might only need a monthly cabin tidy and a quarterly exterior. The monthly budget for each tail reflects its service frequency, so you're not paying for work that doesn't happen.
What happens if an aircraft leaves the fleet mid-contract?
You can remove a tail from the programme with thirty days' notice; the monthly fee stops at the end of that notice period. If you sell an aircraft, retire it, or move it to another base, give us thirty days' notice and we'll stop billing for that tail at the end of the notice window. The service history and photo archive stay in your shared folder, and you can request a final report summarising all work completed during the time the aircraft was in the programme. There's no early-termination fee, and the monthly rate for your remaining aircraft stays unchanged.
Do you work around the airport's night closure?
Yes, we schedule all work inside the airport's operating hours or arrange extended access with the GAC in advance. Klagenfurt closes at 23:30 local most nights (22:00 on Saturdays), and customs, fuelling and handling shut down at the same time. For fleet aircraft that overnight regularly, we schedule detailing during the daytime or early evening, finishing well before the airport closes. If you need work done outside operating hours—say, a pre-dawn departure polish—we coordinate with the GAC to arrange extended apron access and notify security in advance.
How do you handle brightwork restoration on a twelve-month cycle?
Brightwork is inspected quarterly and polished as needed, with a full restoration once a year. Every quarter, we inspect all visible brightwork—nacelle rings, door handles, windscreen surrounds—for oxidation and micro-scratches. Light hazing gets a single-stage polish on the spot; heavier oxidation is logged for the annual restoration, when we pull every piece of trim, compound it back to bare metal, and seal it with a long-duration wax. The annual restoration is scheduled during a planned maintenance window or a low-utilisation month, so the aircraft isn't out of service solely for appearance work.
What if the flight schedule changes and a planned service has to be rescheduled?
We adjust the calendar in real time and reschedule the service to the next available layover or turnaround. Flight schedules change constantly, and we expect it. If a planned deep interior has to move because a charter client extended the trip, or if a quick turn gets skipped because the aircraft diverted, we shift the service to the next time the aircraft is on the ground at Klagenfurt for more than two hours. The monthly budget doesn't change unless we have to skip multiple services in a row, in which case we either bank the unused hours for a heavier service later or credit the difference to the following month.
Do you carry your own equipment onto the apron, or do you use the handler's gear?
We bring our own detailing equipment, consumables and waste-recovery tanks; we only request GPU and water from the handler. We arrive with everything needed for the scheduled service: pressure washers, vacuum extractors, polish compounds, microfibre cloths, cabin-safe cleaners, and waste-recovery tanks for rinse water and spent polish. The only items we request from the handler are GPU (if the APU is staying off) and potable water for rinseless washes. That keeps us independent of the handler's equipment availability and ensures we're using the correct products for your aircraft's OEM cabin materials and paint system.
How does the quarterly review work?
We meet with your operations team every three months to review the service history, adjust frequencies, and plan seasonal work. Every quarter, we schedule a call or an in-person meeting with your chief pilot, flight-department manager, or whoever oversees the fleet. We walk through the service history for each tail—what was done, what defects were observed, how the aircraft's appearance has trended over the past three months—and discuss whether any frequencies need to change. If utilisation has increased, we might add more quick turns; if winter is approaching, we plan the decon wash and anti-static treatment. The review takes about thirty minutes per tail, and we send a written summary afterward.
Can you coordinate with our maintenance provider for access to gear bays or belly panels?
Yes, we liaise with your maintenance team to schedule access during inspections or when panels are already open. If your aircraft is due for a scheduled inspection or if maintenance is already pulling gear doors or belly panels for unrelated work, we coordinate with your maintenance provider to detail those areas while they're accessible. That avoids duplicate downtime and ensures we're not opening panels solely for cleaning. We confirm with the maintenance team which areas are safe to touch, which fasteners we're allowed to remove, and when the panels need to be closed again.
What consumables are included in the monthly budget?
All standard consumables—cleaners, polish, wax, microfibre cloths, waste disposal—are included in the fixed monthly fee. The monthly budget covers everything we use during routine services: pH-neutral exterior wash, rinseless dry-wash solution, single-stage polish, brightwork compound, OEM-approved cabin cleaners, leather conditioner, microfibre towels, and disposal of waste water and spent product. Specialty treatments—decon wash after a long dust-storm exposure, enzyme cleaner for a biological spill, anti-static coating before winter—are quoted separately, but the pricing is transparent and agreed before we start the work.
Do you provide service for transient aircraft from the same operator outside the fleet programme?
Yes, transient aircraft from fleet-programme clients receive priority scheduling and the same crew familiarity. If one of your fleet aircraft diverts to another airport, or if you operate a transient aircraft that's not part of the twelve-month programme, we treat it as a priority request and dispatch a crew familiar with your standards and your aircraft type. The work is billed separately at our standard ad-hoc rates, but you skip the queue ahead of non-programme clients, and the crew already knows your preferences for cabin materials, exterior products, and documentation format.