Call now Book a Service
EGLF · FAB · Farnborough / London, United Kingdom

Exterior Dry Wash at Farnborough (EGLF)

Waterless exterior cleaning for super-mid to ultra-long-range jets at the UK's dedicated business aviation airport

Exterior Dry Wash at Farnborough (EGLF) is a ramp-side waterless cleaning service for chief pilots, flight-department managers and charter operators bringing super-midsize, heavy and ultra-long-range business jets through the UK's largest dedicated business aviation airport. Because Farnborough Airport Ltd is the sole handling agent and ground handling is mandatory, every exterior dry wash is coordinated through the FBO; we arrive airside with aviation-approved rinseless products, clean the fuselage, wings, empennage, nacelles, belly, gear and brightwork on stand, and leave no runoff. The service suits both transient aircraft on a tight turnaround and jets based in the hangars that need recurring care between trips.

Runway

06/24 · 2440 m

AIP and airport data
Elevation

238 ft

Operating hours

Monday-Friday 07:00-22:00 local; Saturday, Sunday and Bank Holidays 08:00-20:00 local; closed Christmas Day and Boxing Day

Closed outside these hours (planning Condition 8) - no extensions except emergencies; PPR required for all movements
Handling agents

1 on the airport

independent, no affiliation
GA terminal

The whole airport is a business aviation terminal operated by Farnborough Airport Ltd (award-winning Domus III facility, hangars, Aviator hotel on site)

How does a third-party detailing crew work through Farnborough's single-operator FBO?

Farnborough Airport Ltd operates the runway, the handling and the FBO as one entity, and planning permission requires that all ground handling is provided by the airport itself. There are no competing handlers on the apron. When you book an exterior dry wash, we notify the airport's operations team in advance, submit our personnel details for airside escort and confirm the stand assignment and turnaround window.

On the day, an airport escort meets our crew at the Domus III facility, walks us airside and remains present throughout the wash. We carry our own rinseless chemicals, microfibre cloths, brushes and ladders; the airport supplies GPU if you need avionics dark, and we plug our lighting into ground power or use battery packs after dark. The whole arrangement mirrors what you already do for catering or line maintenance: one phone call to the FBO, one invoice line, no separate contractor gates.

Because the airport manages every movement under a PPR system and tracks its annual cap of fifty thousand movements, they prefer as much notice as possible—ideally forty-eight hours for a dry wash, though we have turned around aircraft the same morning when a slot opens and the escort is free.

What timing works between legs at Farnborough?

A dry wash takes three hours for a super-midsize jet in light soiling, five to six hours for a Global or Falcon 7X with exhaust staining on the belly and nacelles, and up to eight hours for an ACJ or BBJ if you want the gear bays degreased and the cheat line brought back to gloss. Most chief pilots schedule us during a planned overnight stop or a longer same-day gap—say, inbound at ten in the morning, outbound at six in the evening.

If you operate a tight turnaround—two hours on the ground for fuel, catering and a crew change—the dry wash moves to the night before or the morning after. We have also split the job across two short visits: fuselage and wings during a quick turn, then belly and gear bays during the next longer stop. The single-FBO model actually makes split scheduling simpler, because operations already has both movements in the system and can assign the same stand or a neighbouring one.

For aircraft based at Farnborough and parked in one of the hangars, we work to your departure calendar. You tell us which day the jet next flies, and we arrive the afternoon before to wash inside the hangar or on the apron if the weather is dry and the stand is free.

What changes at Farnborough that a detailing crew needs to know?

Farnborough sits at two hundred and thirty-eight feet elevation in Hampshire, about an hour west of central London by road. The single runway—06/24, two thousand four hundred and forty metres—handles everything from light jets to ACJs and VIP wide-bodies during the biennial airshow, though day-to-day traffic is overwhelmingly super-midsize and above. Operating hours are Monday to Friday 07:00 to 22:00 local, Saturday, Sunday and Bank Holidays 08:00 to 20:00 local, and the airport is closed Christmas Day and Boxing Day. Planning Condition 8 prohibits movements outside these hours except in an emergency, so if your inbound flight arrives late and pushes the dry wash past curfew, we either start the next morning or move the work to a different day entirely.

Because the airport is dedicated to business aviation—no scheduled passenger services, no inclusive-tour charters, no training circuits—the apron is quieter and more predictable than a mixed-use field. Stands are assigned by the FBO with plenty of room between aircraft, which means we can set up ladders and work around the empennage without waiting for a neighbouring jet to push back. Hangar space is available on site, including a new hangar completed in 2024, so aircraft that stay overnight or longer often go inside, and we wash them there under LED high-bays with no weather delays.

Does recurring dry-wash work make sense for a jet based at Farnborough?

If your aircraft spends more than half its nights at Farnborough—either because the principal lives nearby or because the flight department uses it as a European hub—a standing dry-wash schedule saves time and keeps the exterior ahead of oxidation. We recommend a waterless wash every two to four weeks for jets in regular service, timed around your flying pattern so the aircraft is always clean for the next departure.

A typical recurring agreement looks like this: we visit every third Thursday afternoon, the FBO notifies us which stand or hangar bay the jet is in, and we complete the wash before the weekend. If the aircraft is away on a trip, we shift to the following week; if it comes back filthy from a de-icing event or a long North Atlantic leg through sooty air, you call us in early and we reset the interval. The airport's operations team gets used to seeing our crew, the escort process becomes routine, and the invoice rhythm matches your other monthly suppliers.

For fleets, we can stagger the schedule—one aircraft every week rather than three aircraft on the same day—so your chief pilot always has at least one jet in presentable condition. The single-handler model at Farnborough makes fleet coordination straightforward: one point of contact for ramp access, one airside-pass system, one set of insurance and security paperwork.

What does a dry wash remove, and what does it leave for a full decon?

An exterior dry wash tackles the film that accumulates between proper washes: bug strikes on the leading edges and radome, exhaust soot around the APU outlet and aft fuselage, hydraulic mist on the belly and gear doors, and general dust on the wings and tail. We spray aviation-approved rinseless cleaner onto the surface, agitate with microfibre cloths or soft brushes, and wipe to a clean finish. The process leaves no standing water, no runoff into apron drains, and no streaks on the windows.

Brightwork—leading edges, nacelle lips, wing-root fairings—gets a light wipe to remove oxidation and restore some gloss, but a dry wash will not bring back mirror finish on badly weathered aluminium; that needs a single-stage polish. Similarly, we degrease the belly and scrub the gear bays, but if the undercarriage has months of baked-on oil and carbon, the job moves into a full decontamination with the aircraft in a hangar and the gear swung.

The value of recurring dry washes is that they prevent the need for aggressive decon work. A jet washed every three weeks never develops the thick soot layer that requires solvent and an hour per nacelle. It stays in the light-maintenance category: quick, non-invasive, no downtime.

What happens when the aircraft is AOG or the schedule changes last-minute?

If your jet goes tech and the departure slips by six hours, we adjust the wash window or postpone to the next duty period. Because Farnborough requires PPR for every movement and the FBO tracks each turnaround, they usually know about schedule changes before we do—operations will ring us and say the inbound is delayed or the tech log has an open item. If the delay is short and we have another job later that day, we swap the order; if it is longer, we move your aircraft to the next available slot in our calendar and the airport's escort roster.

AOG situations sometimes create the opposite request: the part arrives, the engineer signs off the log, and the chief pilot wants the aircraft clean before the owner boards two hours later. We keep a ready kit in the van—rinseless chemicals, cloths, a short ladder—and if we are within thirty minutes of Farnborough and the FBO can arrange an immediate escort, we have turned around an express dry wash in under three hours. It will not be the eight-hour detail with full gear-bay degreasing, but it will remove the obvious dirt and make the jet presentable.

The single-operator model helps here: one phone call to the airport's duty desk sorts out both the schedule change and the airside access, rather than chasing a separate handler, a separate escort company and a separate invoice.

Questions operators ask about Exterior Dry Wash at Farnborough

How far in advance do I need to book an exterior dry wash at Farnborough?

Forty-eight hours is ideal, though same-day service is possible if the FBO can arrange an airside escort and a stand is free. We prefer forty-eight hours' notice so the airport's operations team can schedule an escort and confirm the stand assignment. If you call the morning of arrival and the FBO has escort availability, we can often arrive within two to three hours. Last-minute requests depend on our calendar and the airport's staffing, but the single-operator model makes coordination faster than at a multi-handler field.

Can you dry-wash inside one of Farnborough's hangars?

Yes, and we often do for based aircraft or during poor weather. Farnborough has hangar space on site, including a new hangar completed in 2024. If your jet is parked inside, we bring our rinseless products and lighting into the hangar and work under the high-bays. Hangar washes eliminate weather delays and let us take more care around the belly and gear bays without rushing before the next rain shower.

Does the airport charge extra for a third-party detailing crew to come airside?

The FBO includes airside escort as part of the handling fee; there is no separate contractor-access charge in our experience. Farnborough Airport Ltd provides the mandatory handling and includes airside escort in that service. We submit our crew details in advance, the airport issues temporary passes or arranges a meet-and-escort, and the cost appears on your handling invoice. You do not pay us separately for access, and we have not seen Farnborough levy a distinct contractor fee the way some airports do.

What happens if my departure is delayed and the dry wash runs past curfew?

We stop work before curfew and either resume the next morning or reschedule to a different day. Farnborough's planning permission prohibits movements outside published hours except in an emergency, and the airport enforces those limits strictly. If your inbound flight arrives late and pushes the wash toward curfew, we pause at 22:00 on a weekday or 20:00 on a weekend, secure the aircraft and return the next morning during operating hours. Alternatively, you can move the wash to your next visit.

How does a dry wash fit into a quick two-hour turnaround?

It usually does not; we recommend scheduling the wash the night before or splitting it across two longer stops. A dry wash takes at least three hours for a super-midsize jet, so a two-hour fuel-and-go turnaround leaves no room. Most chief pilots book us during an overnight stop or a same-day gap of six hours or more. If you operate frequent short turns, we can wash the fuselage and wings during one stop, then return for the belly and gear during the next longer ground time.

Can I set up a monthly dry-wash schedule for a jet based at Farnborough?

Yes, and recurring visits are common for based aircraft; we coordinate the calendar with you and the FBO. We visit on a fixed interval—every two, three or four weeks—timed around your flying pattern. The FBO tells us which stand or hangar the jet is in, we arrive with the same escort process each time, and the invoice becomes a predictable monthly line. If the aircraft is away, we shift to the next available week.

Do you need the aircraft on GPU, or can you work with batteries live?

We can work either way; GPU is helpful for lighting after dark, but not required. If you want avionics dark and external lighting off, the FBO supplies GPU and we plug in our work lights. If the aircraft stays on batteries and you are happy with us working around the pitot covers and static ports, we use battery-powered lamps or natural daylight. We never touch avionics bays or open panels, so the electrical state is your choice.

What if the aircraft comes back covered in Type I fluid after a winter departure?

De-icing fluid washes off easily with rinseless cleaner; we treat it as a normal dry wash unless there is thick ice residue. Type I fluid leaves a glycol film that our rinseless products remove without trouble. If the jet also has frozen slush in the gear bays or ice on the belly, we wait until it thaws or move the aircraft into a heated hangar. Once the surface is above freezing, a standard dry wash clears the fluid and any road salt or exhaust soot that came with it.

Does Farnborough allow water runoff on the apron, or is dry wash the only option?

The airport has environmental controls on water use; dry wash avoids runoff entirely and is the preferred method for ramp-side work. Like most UK airports, Farnborough monitors apron runoff for fuel, glycol and chemical contamination. A dry wash produces no runoff, so there are no environmental notifications or drainage restrictions. If you want a full wet wash with pressure and soap, that work moves into a hangar or a designated wash bay, and we coordinate the wastewater plan with the FBO.

Can you clean the belly and gear bays during a quick overnight stop?

Yes, if the stop is at least five hours and the FBO can position the aircraft on a well-lit stand or in a hangar. Belly and gear work adds two to three hours to the dry wash because we need ladders, degreaser and good lighting to reach into the bays. If you arrive in the evening and depart mid-morning, we start after the crew leaves, work through the night if necessary, and finish before your pre-flight inspection. The single-operator FBO makes overnight access straightforward—one call to operations, one escort, no gate complications.

Other services at Farnborough